Renewing the roef (2016)![]() |
Renewing the kitchen (2016)![]() |
|
|
Rebuilding the roof (2015-2019) & the electrical circuit (2015)![]() |
Rebuilding the bathroom (2015-2016)![]() |
|
|
Renewing the floor (2015)![]() |
Renewing the main cabin (2015)![]() |
|
|
Renewing the cabin n°1 (2019)![]() |
Renewing the cabin n°2 (2019)![]() |
|
|
Moving the corridor’s door (2019). To move the cabin 2 from the workshop area (W) to the sleeping area (1 & 2).![]() |
The door is in red color above the (2). ![]() ![]() |
|
|
Renewing the living room (2017-2019) ![]() |
Painting the deck, the roef and the hull (2018)![]() |
|
|
Installing navigation instruments (2019) ![]() |
Sewing new sails covers (2020)![]() |
|
|
Maintaining the wooden spars (2020) After grinding, I painted 3 layers of a special transparent paint based on linseed oil (Perkoleum Hoogglans, Teak color). |
|
![]() |
![]() |
|
|
Restoring old blocks![]() ![]() |
They are in pitch pine glued with epoxy. Then, they are impregnated with linseed oil and varnished with a linseed oil based transparent paint.![]() |
|
|
Checking the rigging and fixing problems (20??) |
This website section is still under construction because maintaining a ship is an endless process !